Process/AgileTable-stakesLegacy

Waterfall

A traditional project approach where each phase (requirements, design, build, test, release) finishes fully before the next begins.

Think of it like

Like building a house: pour the foundation, then frame, then plumb, then paint — each step fully finished before the next begins.

Junior or senior?

Junior sounds like

Dismisses Waterfall as simply outdated.

Senior sounds like

Can explain why it was actually the right fit for that specific project — regulatory, contractual, or safety constraints — without treating it as an automatic red flag.

Ask them

“What made Waterfall the right fit for that project, versus a more iterative approach?”

Reading Waterfall on a resume

Table-stakes
Most people in this field list Waterfall, so its presence tells you little, and opening a screen with it can make the call sound junior. Ask what they built with it instead.
Legacy
Waterfall still runs plenty of real systems, but heavy use often points to older or maintenance work. Ask when they last used it, and on what.

Sourcing for Waterfall

Every way it's written

"Waterfall"

Paste into LinkedIn Recruiter, Naukri or your ATS. Combine with a job title and location.